# Scripture Response Quality Railspike Debug Log

## 2026-10-15T19:04:06Z — Step 1

### Necessary/useful instructions

- Source: `docs/railspike/docs/workflow/step1_solution_assessment.md`, Objective and Structure. Comparing approaches exposed the difference between adjusting guidance and demonstrating reliable output quality after prior iterations. Retain the option comparison and recommendation requirement.
- Source: `docs/railspike/RAILSPIKE.md`, Plan review and Commit discipline. A separate assessment preserves the completed expansion feature and leaves the existing prompt edit intact while the new direction remains reviewable. Retain these boundaries.

### Redundant/unnecessary instructions

- Source: `docs/railspike/RAILSPIKE.md`, How to Use This Chain and Key Rules, instruction reprint requirement. Reprinting the full Step 1 instructions added substantial conversation text before a concise assessment without changing the deliverable. Consider a linked reference plus a short statement of the applicable constraints instead.

### Uncertain assessments

- Source: `docs/railspike/docs/workflow/step1_solution_assessment.md`, Deliverable, one-page limit. The assessment is concise Markdown, but physical page length varies with rendering. Clarify whether the intended constraint is a word budget or a reading-length guideline.

## 2026-10-15T19:12:34Z — Step 1 revision for latency

### Necessary/useful instructions

- Source: `docs/railspike/docs/workflow/step1_solution_assessment.md`, Review and revision. The revised assessment preserves the Original Query and incorporates the new latency concern into the options and joint acceptance criteria without advancing steps. Retain this revision rule.

### Redundant/unnecessary instructions

No supported findings for this revision.

## 2026-10-15T19:19:00Z — Step 2

### Necessary/useful instructions

- Source: `docs/railspike/docs/workflow/step2_feature_description.md`, Success criteria and Completion boundary. Explicit quality and latency targets prevent another prompt revision from being called successful without a working normal-flow result. Retain these requirements.
- Source: the same file, Shared component inventory. Existing thread/post, offline, status, and operator surfaces can be reused while limiting configuration changes to scripture tasks. Retain the inventory requirement.

### Redundant/unnecessary instructions

- Source: `docs/railspike/RAILSPIKE.md`, instruction reprint requirement. Reprinting Step 2 again added a full instruction document before the actual deliverable; consider a linked reference and concise constraints instead.

### Uncertain assessments

- Source: `docs/railspike/docs/workflow/step2_feature_description.md`, one-page constraint. The required sections plus the approved assessment's demand for explicit sample size, latency targets, and budget require a dense document. Clarify a word budget or permit a short acceptance table.

## 2026-10-15T19:42:26Z — Step 3

### Necessary/useful instructions

- Source: `docs/railspike/docs/workflow/step3_development_plan_do.md`, Completion Contract and canonical components. Reading the real request path exposed minute-based cron guidance and missing initial-result polling, so the plan includes dispatch and browser discovery instead of timing only model calls. Retain the normal-flow requirement.
- Source: the same file, risk dependencies. Candidate isolation, budget accounting, and worker contention checks precede live trials, preventing measurement shortcuts or duplicate publication. Retain these gates.

### Redundant/unnecessary instructions

- Source: `docs/railspike/RAILSPIKE.md`, instruction reprints. Three phase reprints add substantial text before the compact plan; consider linked phase references with concise active constraints.

### Uncertain assessments

- Source: `docs/railspike/docs/workflow/step3_development_plan_after.md`, one-page check. Six stages with six required fields each plus the frozen evaluation protocol are concise but exceed a conventional printed page. Clarify whether a compact reading-length guideline or separate approved protocol is preferred for evaluation-heavy plans.


## 2026-10-15 — Step 4, initial evaluation stopped at failed release gates

### Necessary/useful instructions

- Source: `docs/railspike/docs/workflow/step4_implementation_do.md`, Stage Boundary Protocol. Stage 4 was verified and committed with its summary before paid evaluation began; keeping the delivery changes separate makes the unsuccessful candidate comparison reviewable.
- Source: this feature's approved Step 3 Completion Contract and Stage 5/6 dependencies. The explicit no-qualifier/reassessment rule prevented a large speed improvement from being treated as release success despite directly verified quotation errors and incomplete interpretive coverage. Retain the joint gates and dependency.
- Source: the frozen evaluation budget and preservation requirements. Reservation before dispatch and durable evidence allowed resumption after a pre-provider fixture rejection and later interruption without repeating a possibly charged generation or resetting the budget. Retain uncertain-charge reservations and separate failed-attempt reporting.

### Redundant/unnecessary instructions

No new supported findings for this implementation stage.

### Uncertain assessments

- Source: the feature's blind-review protocol and phase timing requirement. One diagnostic read exposed a baseline answer before anonymous review; early monotonic browser measurements lacked wall-clock endpoints needed to isolate discovery exactly. Future protocols should make anonymous output export and complete measurement fields a verified stub gate before any paid call. The report explicitly records these limitations; neither changes the objective quotation-error rejection.

Step 4 is not complete: Stage 6 remains blocked by the failed initial quality gate. This is a reassessment boundary, not a completed-feature handoff.
