Repository source: docs/plans/listing_query_dialog/listing_query_dialog_debug_log.md
Listing query dialog — Railspike debug log
2026-10-19 01:41:34 UTC — Step 3 completed
Necessary/useful instructions
step3_development_plan_before.md, request reconciliation: restored the explicitly approved split and updated its pending status without changing substantive scope. Retain.step3_development_plan_do.md, dependencies and risk validation: fixed-data ordering/filter checks precede enabling board variants, and the first stage has a complete codebase interaction. Retain.step3_development_plan_after.md, completion-contract review: mapped draft retention, storage failure, refresh failure, keyboard recovery, and standalone access to verification stages. Retain.
Redundant/unnecessary instructions
No supported findings.
Uncertain assessments
step3_development_plan_after.md, one-page limit: eight stages with six mandatory fields plus risks and a completion contract exceed a conventional rendered page even with concise fields. The plan favors explicit verifiable scope over omitting required fields; consider a page limit scaled to stage count.step3_development_plan_do.md, approximate one-hour sizing: reuse of the current viewer makes these reduced-scope stages plausible targets, but initial dialog extraction and browser fixtures remain uncertain. Retain the explicit stop-and-replan condition rather than treating estimates as guarantees.
2026-10-19 01:34:05 UTC — Step 3 sizing, returned to Step 2
Necessary/useful instructions
step3_development_plan_do.md, stage sizing and eight-stage/day limit: a draft distributing full listing coverage across eight stages left the initial dialog/source/recovery stage oversized. Removed the unready Step 3 draft and recorded a concrete first-release proposal in Step 2. Retain the rescope rule rather than approving optimistic estimates.RAILSPIKE.md, Enhancement Requests: preserving the prior approved scope and marking the changed boundary as awaiting approval makes deferred coverage visible. Retain.
Redundant/unnecessary instructions
No supported findings.
Uncertain assessments
step3_development_plan_after.md, one-page limit together with all required stage fields: the full-scope draft exceeded a page even in compact bullets. Consider separating the coverage checklist from the stage overview while preserving approval of both.
2026-10-18 16:03:20 UTC — Step 2
Necessary/useful instructions
step2_feature_description.md, Delivery scope and completion boundary: distinguishing covered public-data listings from unavailable separate stores made the proposed release boundary reviewable. Retain.step2_feature_description.md, Shared component inventory: identifying existing viewer and offline-reader surfaces avoids defining competing database lifecycles. Retain.RAILSPIKE.md, risks guidance: requiring early validation surfaced query parity, source compatibility, and state recovery as prerequisites for rollout. Retain.
Redundant/unnecessary instructions
No supported findings.
Uncertain assessments
step2_feature_description.md, one-page limit versus enumerating every existing surface: complete listing scope and explicit coverage gaps exceed a typical rendered page. Consider allowing a compact scope inventory alongside the feature description when broad coverage is requested.
2026-10-17 — Step 1
Necessary/useful instructions
RAILSPIKE.md, Key Rules and Step 1 structure: comparing approaches before implementation exposed the local-data and listing-coverage questions. Retain the comparison and approval gate.step1_solution_assessment.md, Recommendation: requiring a vertical slice keeps auto-run, editing, retained state, and recovery in the same user outcome. Retain.
Redundant/unnecessary instructions
No supported findings.
Uncertain assessments
step1_solution_assessment.md, one-page limit: the broad coverage request requires scope qualifications alongside options; the concise Markdown artifact may exceed a rendered page depending on display. Clarify whether this limit is a length guideline or a fixed rendering constraint.
2026-10-19 02:13:15 UTC — Step 4 completed
Necessary/useful instructions
step4_implementation_before.md, planning commit gate: branch and approved planning commit201343c9preceded application edits; feature plans and navigation remain together. Retain.step4_implementation_do.md, canonical reuse: reusing the SQLite editor/explorer and repository row selection preserved standalone behavior and avoided the sample query row cap. Retain.step4_implementation_after.md, qualified verification: recorded 20 focused PHP passes, real SQL.js browser parity/recovery, timing variability, deferred families, and unrun full-suite/cross-browser checks separately. Retain.
Redundant/unnecessary instructions
No supported findings.
Uncertain assessments
step4_implementation_do.md, inspect verification before stage commit: two tool orchestration sequences committed before their browser outputs were inspected. Corrective commits3bf80f73andf4618c98restored verified boundaries before dependent stages. The rule is useful; consider an explicit reminder that awaiting a tool result and inspecting it must precede preparing the commit call, particularly with orchestrated tools.
Completion evidence
Eight stages completed; Stage 8 acceptance commit
a8087420; eleven cycle commits before this log-only handoff commit, exceeding the nine-commit minimum. No implementation history rewritten.Final browser replay passed six board contexts, PHP/SQL.js result parity, paging, read-only enforcement, cache corruption/incompatibility, failed refresh, denied storage, pending-load edits/context switching, navigation drafts, standalone access, and desktop/mobile keyboard return state.
Last local timing sample: cold shell 2.4 ms/results 86 ms, warm shell 8.8 ms, no warm download or additional runtime initialization. Fixture timings varied across runs.
Production deployment and merge are outside scope; no complete-suite or cross-browser claim. Broader listing families remain deferred under the approved split.