Managing production feedback

Start in the request register, linked from the planning index. It owns current request status and next actions for migrated batches. Dated summaries and triage are historical evidence; detailed feature plans retain implementation/approval records.

Intake and identity

  1. Search the register and linked older inventories for the reported outcome and source-post ID. Match by intended behavior and acceptance conditions, not shared keywords or shared source alone.

  2. For a new outcome, allocate an unused permanent ID PF-YYYYMMDD-Fnn or PF-YYYYMMDD-Bnn using the intake date/category and next unused number. Never renumber or reuse retired IDs. Keep an explicit lowercase ID anchor (for example pf-20261021-f07) so links survive title changes. Link the exact report, parent post and full thread; retain every batch/category/item alias, request nuance and import limitation. Label unknowns.

  3. Add workflow state, delivery evidence/date/limits, completion checks, next action, inherited estimate/provenance, proposed workflow and existing plan/evidence links. Use the minimal triage process for benefit/effort/uncertainty; preserve original estimates separately from revised scoped estimates. Scores and recommendations never authorize implementation.

  4. Repeated reports of the same outcome add sources/aliases to the existing request. Distinct outcomes get separate linked requests. Uncertain duplicates stay separate with a review next action; older unreconciled inventories remain explicitly outside migrated coverage.

Updates and closure

Update current fields in the register only; append dated evidence or a concise correction reason when changing claims. Detailed evidence stays in linked triage/feature documents. Historical status tables are snapshots and must link to the register, rather than become a second current-status list.

Workflow: untriaged needs scope/evidence review; ready has clear checks and a proposed next action; planned links an approved plan and its approval boundary; in progress has authorized active work; blocked names the unmet prerequisite and next recovery action; closed records the disposition and evidence. An inherited recommendation or a drafted plan alone is not approval. Local work awaiting deployment may remain blocked with deployment as its next action.

Delivery evidence: unknown/pending, locally verified, deployed, production accepted. Record applicable platform/surface, date and links; these are evidence claims, not automatic workflow transitions. Do not erase a known local result because deployment is unknown. Production acceptance requires evidence against this request's completion checks in the reported environment; adjacent improvements do not establish closure.

Close only with completion evidence and any required production acceptance, or an explicit maintainer disposition (declined, superseded, duplicate) linked to its reason/target. Preserve unresolved checks. Reopen on contrary evidence with the new report, prior closure context and next action. Posting a source-comment reply requires explicit authorization; it is not implied by maintaining this register.

Corrections and recovery

Review diffs/Git history before correcting mistakes; avoid broad resets. For a mistaken merge, restore distinct request records and original aliases/sources, link the correction in both records and recheck coverage. A deliberate merge retains the retired ID as a closed duplicate pointing to the surviving request; transfer all aliases/reports. Splits preserve the original ID as a relationship record and link the separately scoped outcomes. Never silently delete identity or evidence.

Illustrative walkthroughs (not live actions): a new F07 report of the same default-port behavior adds a source to that request; an explicit-port behavior report stays separate. A scoped F03 with defined checks may move to ready, but implementation still needs authorization. Local F02 verification does not imply deployment; deployment evidence alone does not imply production acceptance. A contrary F02 report reopens any later closure. If F08/F09 were mistakenly merged, restore both outcomes with their shared source retained and document the correction.