Repository source: docs/plans/production_feedback_management/production_feedback_management_step4_implementation_summary.md
Debug mode: enabled.
Effort study: railspike-effort / v3/production_feedback_management; ledger.
Implementation summary
Branch: docs/production-feedback-management. Planning commit: 0c93edaa9. Approved Step 3; documentation-only scope unchanged. Storage clarification incorporated; no pending enhancement requests.
Step 4 entry
2026-10-23: scope v1/R1/P2, original baseline 1a358bc9be3cdb725277c792625a678e7bc85436, Codex single exposed rater. 0.35 projected total reaffirmed from Step 3 before implementation; exact R1 references verified during planning, no reference changes. No independent rating or measured effort. Runtime, UI, deployment and production-resolution checks are inapplicable to this documentation migration; dependency delta zero.
Stage 1 - Intake and first requests
Changes: guide and F01–F03 register records; permanent aliases, source/evidence separation and recovery walkthroughs.
Verification: all three source/estimate/alias mappings compared with summary/triage; F02 remains local-only with deployment pending. Add/match/update/reopen examples reviewed; local document paths and diff integrity checked.
Notes: runtime/UI/deployment checks inapplicable; no dependencies. Planning commit
0c93edaa9; no production actions.
Stage 2 - Remaining feature requests
Changes: F04–F11 records and proposed next-work list; shared-source query requests remain separate. F06 explicitly reconciles historical proposed work with later local evidence, retaining pending deployment.
Verification: all 11 feature aliases/sources/estimates checked against source rows; completion checks retained from triage. Local referenced paths and
git diff --checkpassed.Notes: Stage 1 commit
367bf407f; no inherited estimate replaced with a new forecast, no implementation or production claims. Runtime/UI checks inapplicable.
Stage 3 - Bugs and discovery
Changes: five bug records, 16 historical-row links in both October 21 documents, clear historical/current-authority labels, planning-index entry and shared triage links. Older inventories remain unreconciled; partial-import/excluded-context limits retained.
Verification: all 16 aliases/source/estimate mappings checked; B03 remains home-page local-only, B04 retains historical latency relationship without assumed duplicate closure. Register/source/plan local paths and row-anchor targets checked;
git diff --checkpassed.Notes: Stage 2 commit
3235e3ae2; original October 21 assertions retained as historical evidence. No runtime/UI/deployment verification claimed.
Stage 4 - Acceptance and closeout
Changes: compact request index, title-independent permanent anchors, direct retained F02 source-informed 0.10 estimate alongside feedback-only 0.03; correction and status guidance finalized. Updated cycle ledger and fixed relocated artifact links.
Verification:
/tmp/check_feedback_coverage.pypassed exact comparison of all 16 requests, aliases, reporting links, estimates, inherited workflows/status evidence, completion checks and next actions against pre-migration inventories; all 32 source-table links map uniquely to 16 permanent anchors./tmp/check_feedback_docs.pypassed 347 local path/anchor checks across 11 documents (excluding fenced example placeholders). Historical tables are unchanged except ID navigation; all changes are within approved documentation scope. Older inventories remain unchanged; dependency delta zero.git diff --checkpassed. Scripts are disposable checks outside the repository, not new project tests.Walkthrough: index → register → guide/evidence works; repeated F07 reports attach by outcome, explicit-port variants stay separate; F03 ready state does not authorize work; F02 local/deployed/production-accepted distinctions preserve pending checks; contrary reports reopen with prior evidence; mistaken F08/F09 merge restores separate outcomes and aliases; deliberate duplicate closure keeps a redirect and all sources. These are documentation reviews, not production actions or application tests.
Notes: Stage 3 commit
2bdb74b07; no implementation beyond approved documents, no application test suite/UI/deployment/external URL checks required or claimed. Original partial-import coverage and device/production gaps remain; older-batch reconciliation is follow-up scope.
Study closeout
2026-10-23T09:59:27Z: railspike-effort / v3/production_feedback_management, scope v1/R1/P2, Codex single exposed rater. Projected total 0.35 preserved; retrospective scope assessment 0.35, not measured actual effort. Original start 1a358bc9be3cdb725277c792625a678e7bc85436; planning 0c93edaa9, delivered stage commits 367bf407f, 3235e3ae2, 2bdb74b07, followed by Stage 4 acceptance/closeout. Four planned/completed stages, no split or changed scope; stable anchors and estimate provenance are ordinary corrective refinements. Exact R1 sources retained, prior snapshots preserved. Maintainer comfortable-fit and study acceptance pending; accepted-outcome count unchanged. No independent rating or active-work measurement. Final commit references are in branch history and the handoff debug log.