Completion Contract

  • Step 2 approved in conversation. From User Access profiles or the shared pending-user list (legacy and Tools routes), new-member review states “By approving this user, you vouch for their conduct and integrity.” before signing. Existing key-access consequences and key identity remain visible; own-key and cross-account-key grants retain their distinct meanings.

  • Confirming completes the existing signed approval; cancelling signs/publishes nothing and permits retry. Preparation/signing/submission failures retain actionable feedback and permit retry. Verify normal rendered entry points and the real signed flow using isolated fixtures, without production writes.

  • Scope: shared review presentation and pending-list wiring, focused existing checks, UI-copy audit, and cycle artifacts. No schema, navigation, authorization, record, or deployment changes. Release requires the checks below; reverting this presentation change requires only a code rollback.

Key Risks

  • High risk: pending-list actions currently pass confirm: false, bypassing review entirely. Source inspection found this before implementation; remove the bypass and verify cancellation leaves the row and signing/publication untouched. This reuses the existing dialog required by Step 2, rather than adding a second review.

  • Misleading key-grant wording: source confirms new_account, own_account_key, and cross_account_key classifications. Limit the social sentence to new_account; check all three and retain existing cross-account key-count/access warnings.

  • Missed surfaces or duplicate help: shared profile partial consumes ApprovalPolicy::review; prepared API feeds the same review to browser signing. Standard/Forte profile templates have no direct approval form. Validate pending-route wiring and rendered User Access review, retaining contextual consequences rather than page-wide help. Any newly discovered independent approval path must be resolved before completion.

Stage 1

  • Goal: deliver the complete review-and-approve slice across existing actionable entry points.

  • Dependencies: explicit Approved Step 3; create a feature branch, organize this cycle under docs/plans/user_approval_meaning/, repair navigation/index references, and commit approved plans and existing debug log before implementation.

  • Expected changes: extend the canonical new-member review consequence with the approved sentence; route pending actions through the existing shared confirmation; update the UI-copy audit after verification. Keep labels, key-access warnings, signing, and permission policy intact. Extend existing checks only where they protect classification, review delivery, or cancellation/recovery behavior.

  • Verification approach: run ApprovalPolicyTest and UserAccessTest, plus affected prepared-approval API checks; run the existing approval_review.mjs at desktop/phone widths with pending confirmation/cancel/retry and failure/retry coverage; run account_key_approval.mjs for real HTTP signed approval, three classifications, cancellation/retry, and rebuild persistence. Inspect the rendered new-member consequence and key-grant states on User Access at 390px/1280px. Run relevant PHP/JS syntax and diff checks. Record focused results and any baseline failures without claiming a full-suite pass.

  • Risks or open questions: the existing browser fixture expects pending approvals without confirmation; update that expectation and verify one shared confirmation per attempt. If required checks fail, diagnose within scope before declaring completion; materially changed scope returns for approval.

  • Canonical components/API contracts touched: ApprovalPolicy::review consequence only (no signature or payload-shape change); pending_approvals.js caller of ForumBrowserSigning.submitSignedApproval; existing profile partial and prepare/finalize API remain consumers. No database changes.

  • Completion: update Step 4 summary and UI-copy audit with evidence; commit this stage with its summary before reporting completion. No deployment or external-service verification applies to this local presentation change.

Request disposition

  • Request: Approved Step 2 / Disposition: proceed to development planning within approved scope / Approval status: Step 2 approved; Step 3 pending / Outcome: this plan. No additional enhancement requested; optional effort study remains unselected.